For most of my career as a CAD manager, there was a joke in the office that the company ran on two religions. The design floor ran on Autodesk. The GIS group, three corridors away, ran on Esri. Each side was perfectly content, and each regarded the other’s software with the quiet pity that people reserve for a neighbor’s choice of car. Projects crossed the corridor as exported files, usually with a polite note, and as often as not came back with a less polite one. We had a standing monthly meeting, officially called “Design and GIS Coordination,” and unofficially known as “The Peace Talks.”
The turning point was a day when a client, a water utility, sent us a request for tender that listed, in one paragraph, a requirement for “BIM-compliant delivery under ISO 19650” and, in the next, a requirement for “delivery of as-built data into the client’s ArcGIS enterprise geodatabase.” It didn’t say which religion we should follow. It said both, and it expected the data to move from one to the other without a person retyping it. We discovered, in the following weeks, that the two vendors had been quietly building bridges for years, that the bridges were real, useful and incomplete, and that the quality of the crossing depended much less on the software than on what we agreed before we started.
This guide is about those bridges, and about the larger movement that is carrying us across them: the convergence of BIM and GIS, and of the design and geospatial industries that grew up around them. I’ll describe the two platforms in plain terms, how data and workflows move between them, the main patterns of interoperability (and their trade-offs), what is likely to keep converging and what will not, how to design a vendor-neutral architecture that survives product changes, how an organization (and a CAD manager) should prepare, a readiness checklist you can score, a machine-checkable exchange manifest and a worked example. It is part of our Autodesk series. For the technical foundations of BIM and GIS exchange, read BIM and GIS Integration: Revit, IFC and CityGML first. For related ground, see AutoCAD Map 3D vs. ArcGIS Pro vs. QGIS: Which Should You Choose? and Digital Twins and 3D GIS.
A note on facts: this is the fastest-moving area in our field. Product names, integrations, licensing, availability and roadmaps for both vendors change often, partnerships are renegotiated and features are retired. I describe what the integrations are for, and the principles that outlast them, and I flag product-specific statements as things to verify in current vendor documentation. I cannot test commercial software or call vendor services from this environment. The Python examples (a manifest validator and a readiness score) were tested.

The Two Platforms, in Plain Terms
Autodesk’s side (design and construction)
In the context of this series, the Autodesk portfolio spans:
- AutoCAD, AutoCAD Map 3D and Civil 3D: drawing, GIS-in-CAD and civil engineering design. See AutoCAD Map 3D Beginner’s Guide and Civil 3D for GIS Users: Beginner’s Guide.
- InfraWorks: conceptual infrastructure design and visualization. See InfraWorks: Planning and Conceptual Design with GIS Data.
- Revit: BIM authoring for buildings and, increasingly, other assets.
- ReCap and reality capture tools. See Point Clouds with ReCap, Civil 3D and GIS.
- The construction cloud and its document management: a common data environment for project information. See Autodesk Docs and Construction Cloud for Geospatial and CAD Data.
- Forma and early-stage planning tools (check the current product line and naming).
- Autodesk Platform Services: web APIs for viewing, translating and automating. See Autodesk Platform Services (APS): Web Viewers and APIs for CAD and GIS Data.
Its centre of gravity is creating designs and delivering projects.
Esri’s side (geography and enterprise GIS)
Esri’s ArcGIS platform, in the same terms, covers:
- ArcGIS Pro: the desktop GIS, with 2D and 3D, analysis, editing and mapping.
- ArcGIS Enterprise and ArcGIS Online: server and cloud platforms for sharing maps, services and apps.
- Geodatabases: the file and enterprise database formats for managing spatial data with rules and versioning. See Enterprise GIS & Spatial Databases: PostGIS, Geodatabases, and Server Architecture.
- Specialized products: indoor GIS, 3D urban modeling, utility network management and others (check the current catalog).
- Developer tools: REST APIs, JavaScript and Python libraries.
- BIM-related capabilities: reading BIM files in Pro, and products that connect to construction project data (verify current names and availability).
Its centre of gravity is managing, analyzing and sharing geographic information across an organization.
The honest comparison
| Question | Autodesk (typical strength) | Esri (typical strength) |
|---|---|---|
| What is the core object? | A design: drawings, models, sheets | A feature or service in a geodatabase |
| Geometry detail | Very high, parametric | Generalized, scaled to the task |
| Coordinate reference | Project-based, with real-world options | Real-world by default |
| Analysis | Engineering analysis (volumes, hydraulics, clashes) | Spatial analysis at scale, network and statistical tools |
| Multi-user data management | Common data environments, project-based | Enterprise geodatabases, services, versioning |
| Time horizon | Project: design to handover | Organization: continuous operation |
| Typical users | Designers, engineers, contractors | Analysts, asset managers, planners, public |
Neither vendor is, in any sense, “the right one.” They solve different parts of the lifecycle. The industry question is how to make the join between them reliable.
How Data Actually Moves: The Six Interoperability Patterns
Over the years, I’ve seen six distinct ways of crossing the corridor. A mature organization uses several, for different purposes.
Pattern 1: File exchange
The oldest, simplest and still most common: one side exports a file, the other imports it. Typical carriers:
| Direction | Carriers |
|---|---|
| Design to GIS | DWG or DXF (converted with GIS tools), IFC, LandXML, GeoPackage, Shapefile, CityGML or CityJSON, DEMs and rasters |
| GIS to design | Shapefile, GeoPackage, DWG exports, GeoTIFF and DEMs, point and CSV tables, IFC or 3D context models |
Esri’s tools include utilities for converting CAD data to geodatabase and reading BIM files directly, and Autodesk’s tools import and export common GIS formats through Data Connect and export profiles (see Importing and Exporting GIS Data in AutoCAD Map 3D). The open-source GDAL library reads and writes many formats on both sides (see Working with DWG and DXF Files in GIS (QGIS, ArcGIS, GDAL)).
- Strengths: universal, simple, auditable, works offline.
- Weaknesses: a snapshot goes stale, each exchange is a chance for error, and meaning (attributes, topology, identifiers) is easily lost.
- Best for: project milestones and deliverables, with a validated specification.
Pattern 2: Service-based access
Instead of copying a file, one side publishes a service and the other connects to it: web map services, feature services, standard OGC interfaces, or vendor-specific services. A designer in Map 3D can connect to a published feature service for current parcels, and a GIS can consume a map service built from design data.
- Strengths: current data, no file handling, one source of truth.
- Weaknesses: needs connectivity, security and a managed service. Limited editing in some contexts. The designer sees a live layer that can change under their feet (so snapshot what you design against).
- Best for: reference data that others maintain.
Pattern 3: Vendor connectors and integrated products
Both vendors, and in some cases jointly, provide products and plugins that connect their platforms: tools that read Revit and IFC in the GIS, tools that display GIS layers inside design software, and products that link project documents in the construction cloud to maps in the GIS. A partnership between the two vendors announced years ago set the direction of interoperability, and various connectors and capabilities have followed. Verify the current list, supported versions, licensing and limits before designing a workflow around any of them.
- Strengths: designed for the job, supported, often the least effort for supported cases.
- Weaknesses: tied to versions, subscriptions and the vendors’ roadmaps. Features move or are retired. Coverage is partial.
- Best for: the common, well-supported cases, and as accelerators for pilots.
Pattern 4: Middleware and data integration
A data integration platform (such as FME, the commercial tool described in Batch Processing DWG Files: Core Console, Scripts and FME) or a set of open-source tools (GDAL, Python, IfcOpenShell, PostGIS) sits between the two platforms, reading, transforming and writing in both directions, on a schedule or on demand.
- Strengths: handles many formats, repeatable and documented, neutral between the vendors, ideal for QA and transformation rules.
- Weaknesses: licensing or development effort, another system to maintain.
- Best for: recurring flows, complex mappings, and being independent of either vendor.
Pattern 5: API-level integration
Both platforms expose APIs. A custom application (a web portal, a pipeline, a dashboard) can call Autodesk’s cloud APIs to read project data and translate models, and the GIS vendor’s REST APIs and libraries to read and write features, and link the two. This is the route taken in the portal in Autodesk Platform Services (APS): Web Viewers and APIs for CAD and GIS Data.
- Strengths: total flexibility, tailored experiences, event-driven automation.
- Weaknesses: needs developers, ongoing maintenance and API version management, and security work.
- Best for: organization-specific workflows and products.
Pattern 6: Open standards as the common language
Choose open formats and interfaces as the contract between systems, so that neither vendor’s product is the interface: IFC for BIM, CityGML or CityJSON for city models, GeoPackage for vector data, GeoTIFF or cloud-optimized formats for rasters, OGC web services and 3D Tiles or equivalent for streaming, LandXML or InfraGML for civil data, BCF for issues and IDS for requirements. See Shapefile vs. GeoJSON vs. GeoPackage: Which Format to Use? and Cloud-Native Geospatial (COG, STAC, Zarr).
- Strengths: vendor independence, long-term archive, broad tool support.
- Weaknesses: standards lag features, implementations vary in quality, and the richest vendor-specific information may not fit.
- Best for: the core contract of any long-lived data relationship.
Which pattern when?
| Situation | Recommended |
|---|---|
| Project milestone delivery to a client | File exchange (open formats) with a validated specification |
| Designers need current parcels and utilities | Service-based access, with snapshots |
| A one-off pilot to prove value | Vendor connector |
| Recurring flow of as-builts into the enterprise GIS | Middleware with validation |
| A stakeholder portal with maps and drawings | API integration |
| Long-term archive and multi-vendor environments | Open standards |
What Typically Works Well, and Where the Gaps Are
Without naming every feature (which would date this article), here is the pattern that I have seen in practice.
Works well
- Reading CAD and BIM data in the GIS for display and basic analysis, including georeferenced IFC or Revit models as 3D layers.
- Publishing GIS data as services that design tools consume as reference.
- Converting CAD linework and annotation to GIS features with a well-prepared drawing. See Working with DWG and DXF Files in GIS (QGIS, ArcGIS, GDAL).
- Exchanging surfaces and terrain as rasters and TINs in standard formats.
- Linking documents and issues to locations in a construction cloud and a map.
- Streaming large 3D scenes for visualization in both ecosystems.
Still hard
- Round-trip editing. Designing in one tool, editing in the other, and syncing changes both ways is fragile. Prefer one master per data type, and one-way flows.
- Preserving rich semantics. Property sets, classification, relationships and custom objects rarely cross intact. Specify exactly which attributes must survive.
- Topology and rules. A utility network model in a GIS has connectivity rules that a drawing doesn’t carry, and vice versa.
- Georeferencing consistency. The same model placed differently by different tools. See BIM and GIS Integration: Revit, IFC and CityGML.
- Identifiers. Keys that change between exports.
- Very large models with performance limits.
- Versions. Features tied to specific releases of both vendors.
- Licensing and subscription boundaries, which determine who can use which connector.
The gaps are narrowing, but each one is a reason to write an exchange specification, and not to assume a connector handles it.
Convergence: What Is Driving It
Why are two industries that grew up apart moving together?
- Owners want one picture of their assets across design, construction and operation, and are writing it into contracts (information management standards, digital delivery requirements, asset data standards).
- Digital twins require both the detail of BIM and the context and analytics of GIS. See Digital Twins and 3D GIS.
- Infrastructure projects are linear and geographic, and the open BIM standard has been extended to roads, rail and bridges, bringing alignments into the BIM world. See Parcels, Alignments and Corridors in Civil 3D: A GIS Perspective.
- Climate and resilience analysis needs building-scale detail inside regional hazard models.
- Reality capture (scans, drones, mobile mapping) produces data that is inherently both geospatial and design-relevant. See Drone Photogrammetry to Civil 3D Surfaces.
- Cloud platforms and APIs make it feasible to connect systems without file shuffling.
- Regulators are adopting 3D and digital submission, drawing on both traditions.
- Open standards bodies are collaborating, aligning the vocabularies of BIM and geospatial.
- AI and automation need clean, connected, well-identified data to be useful.
- Skills: a generation of professionals who learned both.
What is likely to keep converging
- Georeferencing and coordinate handling in BIM, becoming a normal part of the model, not an afterthought.
- Infrastructure BIM, with alignments and linear referencing in open standards.
- Common data environments that store both design and geospatial information.
- Web-based 3D viewing of both kinds of data in one place.
- Semantic mapping between building and city models.
- Identifiers and data dictionaries shared across domains.
What is likely to stay different
- The center of gravity. Design tools will stay design tools, and enterprise GIS will stay enterprise GIS, with a growing overlap in the middle.
- The scale of detail. A city model and a construction model have different needs, and a single model for everything is more slogan than plan.
- The business models, licensing and product lines of the vendors.
- The professional cultures: surveyors, designers, analysts and asset managers will keep their own vocabularies.
So the realistic goal isn’t one tool. It is a reliable join between tools, defined by agreements and open contracts.
Designing a Vendor-Neutral Architecture
If you remember one idea from this guide, make it this one: design your data architecture around your data and your questions, not around a vendor’s current product list. Products come and go. Data lives for decades.
The principles
- Own the master data. The authoritative copy of each data type lives in a system you control, in documented, open or exportable form.
- One master per data type. Parcels have one master (usually a GIS or the registry). Design models have one (the BIM or CAD authoring environment). Never two.
- One-way flows where possible, from the master to consumers, with snapshots, not live copies, for anything that a project designs against.
- Stable identifiers carried across every system.
- A defined coordinate strategy: one real-world reference system for the organization, with documented transformations for projects.
- Open contracts at the boundaries: specifications written in terms of open standards and checked automatically.
- Validation at every border: nothing enters the master data unchecked.
- Layered architecture: storage (database and files), integration (middleware, APIs), services (feeds and maps), applications (design tools, GIS apps, portals).
- Replaceable parts: any single tool can be swapped without rebuilding everything.
- Documentation and an exit strategy: you can export all your data in open formats at any time.
A reference picture
Design and construction tools Integration layer Enterprise data Consumers
(AutoCAD, Civil 3D, Revit, ...) -> validation, mapping, -> spatial database / -> GIS apps, web maps,
conversion (open geodatabase, dashboards, field apps,
Common data environment standards, scripts, document store, viewers, analytics
(project documents, models) middleware) asset registerThe integration layer is the heart of it. It’s where the exchange specification lives, where validation runs and where translation between the two worlds is implemented, once, in one place.
A Machine-Checkable Exchange Manifest
A one-page agreement (as in the companion guide) is the start. A manifest file that travels with each delivery lets a script verify it. A minimal version, in JSON:
{
"project": "Hospital wing",
"horizontal_crs": "EPSG:32631",
"vertical_datum": "Local benchmark BM-17",
"units": "m",
"origin": { "easting": 451200.0, "northing": 5410100.0, "height": 212.0 },
"rotation_deg": 30.0,
"status": "design",
"date": "2026-05-01",
"source": "Revit export, model v14"
}And a validator that every delivery passes before it is accepted:
import re
REQUIRED = ["project", "horizontal_crs", "vertical_datum", "units", "origin",
"rotation_deg", "status", "date", "source"]
def validate_manifest(m):
problems = []
for k in REQUIRED:
if k not in m or m[k] in (None, "", []):
problems.append(f"missing: {k}")
crs = str(m.get("horizontal_crs", ""))
if crs and not re.fullmatch(r"EPSG:\d{4,6}", crs):
problems.append("horizontal_crs should look like EPSG:32631")
if m.get("units") not in (None, "m", "mm", "ft", "us-ft"):
problems.append("units must be one of m, mm, ft, us-ft")
o = m.get("origin")
if isinstance(o, dict):
for k in ("easting", "northing", "height"):
if not isinstance(o.get(k), (int, float)):
problems.append(f"origin.{k} must be a number")
elif o:
problems.append("origin must be an object with easting, northing, height")
if m.get("rotation_deg") is not None and not isinstance(m["rotation_deg"], (int, float)):
problems.append("rotation_deg must be a number")
if m.get("status") not in (None, "design", "as-built", "concept", "construction"):
problems.append("status must be design, as-built, concept or construction")
return problems
# The manifest above passes: []
# A manifest with no vertical datum, "UTM 31N" as CRS, "feet" as units and a text origin returns:
# ['missing: vertical_datum', 'horizontal_crs should look like EPSG:32631', 'units must be one of m, mm, ft, us-ft',
# 'origin.easting must be a number', 'origin.northing must be a number', 'origin.height must be a number']Tested on a good and a bad manifest, the validator accepted the first and returned the six problems listed for the second. Extend it with your own fields: the IFC version, the export settings, the classification system, the validation tool and the owner. Put it in the project template, so that no delivery goes out without one, and no delivery is loaded without checking it. The check takes a second, and it would have caught most of the incidents in my career.
Organizational Readiness: A Maturity Check
Convergence is as much about organizations as about software. A short self-assessment helps to find the weak link. Score each area from 1 (ad hoc) to 5 (optimized), weigh them by importance for your context, and let the arithmetic show where to start.
| Area | What a high score looks like |
|---|---|
| Coordinates | One real-world system, documented, every project georeferenced from survey control, with checks |
| Identifiers | Stable IDs in every system, preserved across exchanges |
| Standards | Written layer, attribute and delivery standards, with templates |
| Exchange | Specifications, manifests and validation scripts in daily use |
| Governance | Named owners for data, standards and tools, change control, audits |
| Skills | Staff literate in both worlds, with cross-training |
| Tools | Fit for purpose, integrated, and maintained |
def maturity(scores, weights):
total = sum(weights.values())
s = sum(scores[k] * w for k, w in weights.items()) / total
level = ("ad hoc" if s < 1.5 else "emerging" if s < 2.5 else "managed" if s < 3.5
else "integrated" if s < 4.5 else "optimized")
weakest = sorted(scores, key=lambda k: (scores[k], -weights[k]))[:2]
return round(s, 2), level, weakest
scores = {"coordinates": 3, "identifiers": 2, "standards": 3, "exchange": 2,
"governance": 1, "skills": 3, "tools": 4}
weights = {"coordinates": 3, "identifiers": 2, "standards": 2, "exchange": 2,
"governance": 2, "skills": 1, "tools": 1}
print(maturity(scores, weights)) # (2.46, 'emerging', ['governance', 'identifiers'])In this illustrative example, an organization with good tools but weak governance and identifiers scores 2.46, “emerging”, and the arithmetic points at governance and identifiers, not at buying another tool. That is a very common finding. The most frequent mistake in convergence projects is to buy integration technology to solve an agreement problem.
Skills and Roles for the Converged Organization
| Role | What it does | Where it sits |
|---|---|---|
| BIM/GIS coordinator | Owns georeferencing and exchange agreements across projects | Design technology or digital delivery |
| Geospatial data manager | Owns master geospatial data, standards and quality | GIS group |
| Information manager (in the sense of ISO 19650) | Runs the common data environment, processes and responsibilities | Project or corporate |
| Integration developer | Builds and maintains the integration layer | IT or technology |
| Surveyor or survey lead | Provides control, coordinate definition and as-built verification | Survey |
| Asset data steward | Owns the asset register and its links to models | Operations |
| CAD manager | Standards, templates, plotting, automation and training | Design technology |
The CAD manager’s role evolves from drawing standards to information standards. See The GIS-CAD Specialist: Career Path, Skills and Portfolio. Cross-training is the cheapest investment: a day for designers on coordinate systems and data quality, and a day for GIS staff on how projects are designed and delivered.
Risks and How to Manage Them
| Risk | Mitigation |
|---|---|
| Vendor lock-in | Open formats at boundaries, exportable master data, documented exit plan |
| Product changes and retirements | Don’t build critical processes on a single connector without a fallback. Monitor roadmaps |
| Licensing surprises | Check what each integration requires, for whom, before rollout |
| Data quality issues multiplied | Validate at every border. Publish quality levels |
| Coordinate errors | Georeferencing agreement, check points, manifests |
| Identifier drift | Test preservation, store keys on both sides |
| Security and sensitivity | Need-to-know sharing, controlled services. See Utilities Mapping with AutoCAD Map 3D and Civil 3D |
| Skills gaps | Cross-training, hiring, mentoring |
| Over-ambition | Pilot, measure, expand |
| Governance gaps | Owners, change control, audits |
| Hype | Insist on a use case and a measurable benefit before any build |
A Roadmap: From Peace Talks to a Joined-Up Organization
A staged approach that has worked for me.
Stage 1: Agree the basics (one to three months).
- Write the coordinate and exchange agreement. Choose the organization’s real-world reference system.
- Define the exchange manifest and a validation script.
- Inventory current flows between design and GIS, and the pain.
Stage 2: Pilot one flow (three to six months).
- Pick one valuable flow (for example, as-built utility data into the GIS, or a building model into a campus map).
- Build it with the simplest suitable pattern, with validation.
- Measure time, errors and satisfaction.
Stage 3: Standardize and scale (six to eighteen months).
- Turn the pilot into a standard process, with owners and documentation.
- Add identifiers and semantic mapping.
- Connect the common data environment and the enterprise data store through the integration layer.
- Train staff on both sides.
Stage 4: Extend (ongoing).
- Add use cases (planning, asset management, digital twin).
- Introduce service-based access for current reference data.
- Introduce open requirements (IDS-style) in contracts.
- Review the architecture annually, and the vendor roadmaps.
At every stage, ask the three questions that keep projects honest: What decision does this support? Who owns the data? How will we know it is right?
A Worked Example: A Water Utility Joins Its Two Worlds
Situation: the water utility from my story has design consultants using Autodesk tools, an enterprise GIS built on Esri’s platform, a drawing archive, and a new requirement to receive BIM-compliant, GIS-ready deliveries.
- Assess: the maturity check scores the utility 2.1: good tools, but weak identifiers (no stable asset IDs in drawings), no exchange specification and no owner for data standards.
- Agree: the utility chooses a single real-world reference system, publishes a one-page exchange agreement and a manifest, and names a BIM/GIS coordinator. The asset ID format is defined, and a property is added to the consultants’ templates.
- Pattern per flow:
- As-built pipes and structures into the enterprise geodatabase: middleware with validation, from consultants’ DWG and IFC deliveries. Rejects go back with a report.
- Reference data to designers: feature services for current parcels, mains and structures, which designers snapshot for their projects, with quality levels visible.
- Models for planning and operations: IFC deliveries with georeferencing, read in the GIS as 3D layers, and a simplified CityGML-style extract for the city’s model.
- Documents and issues: the construction cloud’s project data linked to map locations through a small API integration, using the sheet-index approach.
- Open contracts: the specification is written in open terms (IFC, GeoPackage, LandXML), and requirements are expressed as checkable rules.
- Pilot: one treatment plant upgrade. The first delivery fails validation (coordinate base wrong, no asset IDs in two models). The corrections take a day, and the learning goes into the consultants’ template.
- Scale: within a year, 80 percent of deliveries pass validation on the first submission. Loading as-built data falls from weeks to days. The time to answer “what is affected if we close this main?” falls to seconds, and now includes the plant’s equipment.
- Governance: the utility audits a sample of deliveries each quarter, reviews the vendor roadmaps annually and keeps a tested export of its master data in open formats.
- Result: neither religion won. The agreement did.
Common Mistakes
- Buying integration technology to solve an agreement problem.
- Assuming a vendor connector handles georeferencing, identifiers and semantics.
- Two masters for the same data, and round-trip editing.
- No stable identifiers.
- No exchange specification or validation.
- Designing around a product instead of around data and questions.
- Ignoring licensing and version requirements of integrations.
- No exit strategy.
- Treating convergence as an IT project, and not an organizational one.
- Over-ambitious first projects.
- No owner for data standards.
- Ignoring skills and culture.
- Believing the hype (one model for everything).
- Not recording which version of which tool produced what.
Best Practices
- Start with agreements, then tools.
- Own your master data, in open or exportable forms.
- One master per data type, with one-way flows.
- Carry stable identifiers across systems.
- Georeference every project from survey control, and verify it.
- Use open standards at the boundaries.
- Validate at every border, automatically.
- Pilot, measure, standardize, scale.
- Name owners and review regularly.
- Cross-train design, survey and GIS staff.
- Watch vendor roadmaps, and keep alternatives.
- Keep the architecture simple enough to explain on one page.
Final Thoughts
The Peace Talks are over. The two corridors, as it happens, were never really at war. They were two groups of capable people using different words for the same ground, and the language barrier was cheap to cross once someone wrote the glossary. When I think about the convergence of BIM and GIS, I no longer see a clash of platforms. I see the slow, practical work of agreeing what things are, where they are, what they are called and who looks after them, and then letting software, from whichever vendor, carry the information across.
If you want to start tomorrow, you don’t need a budget. Take one project that crosses the corridor. Write down its coordinate system, its origin and rotation, its identifiers and its owner, on one page. Write a manifest and a ten-line validator. Run them on the next delivery. When the first one fails (it will), you will have found the most valuable thing in the whole field: a problem that is cheap to fix now, and that would have been expensive to find later.
Where to go next: go back to the technical foundations in BIM and GIS Integration: Revit, IFC and CityGML, and see the web side of the same story in Autodesk Platform Services (APS): Web Viewers and APIs for CAD and GIS Data.



