Visualizing Proposals in InfraWorks

Visualizing Proposals in InfraWorks

There was a time, in the middle of my years as a CAD manager, when my department was asked to take over the “visualization” for public consultations. Until then, it had been done by whoever had a free afternoon and a copy of some rendering software. The results were uneven in every sense: gorgeous in one project, embarrassing in the next, and in one case, which I remember with a wince, dishonest without anyone intending it. A designer had produced a lovely view of a proposed road cutting, with mature trees softening the slope and a warm evening light. The trees were a hundred years old. The road would open in three years. A resident in the second row of the meeting, a retired forester, put up his hand and said, very politely, “Those trees are not going to be there.” The room went quiet, the designer went red, and the rest of the evening was spent not on the road, but on whether anything we had shown could be trusted.

That evening changed how I thought about visualization. A picture of a proposal is not decoration. It’s evidence, and people will treat it as such. A good visualization makes a project understandable to the people who will live with it. A careless one makes the project suspect. And in between lies the whole craft: choosing the data, the viewpoints, the camera, the light, the vegetation, the speed of the fly-through and the honesty of the caption.

Autodesk InfraWorks is a tool built for this work. It takes the GIS and design data you already have (terrain, imagery, roads, buildings, land use, utilities and constraints), builds a live 3D model of the existing situation, lets you place proposals into it, compare alternatives, and present them as images, storyboards and videos. In this guide I’ll explain how to prepare a model for visual communication, how proposals, cameras, styles and storyboards work, what makes a visualization honest and credible, the practical numbers (lens, speed, frame rate, file size), how to run a consultation with it, what to do when you need more realism than InfraWorks gives, and the mistakes I have seen, and made. It is part of our Autodesk series. For the modeling side, see InfraWorks: Planning and Conceptual Design with GIS Data, and for the 2D side of communication, Mapping and Plotting in AutoCAD Map 3D: Styles, Thematic Maps and Map Book and Cartography Principles: Designing Maps That Communicate.

A note on facts: Autodesk’s tools, their features and their cloud services change over time, and I can’t verify the current state as I write. I describe concepts and typical workflows, and flag points to check in the current documentation.

Diagram: Proposals are compared on a shared model with consistent styles, views and animations.
Proposals are compared on a shared model with consistent styles, views and animations.

What Visualization Is For

Before any button, ask what the visualization must do. Different purposes need different products.

PurposeAudienceWhat it needs
Understand the optionsDesigners, planners, decision makersFast, comparable views of alternatives, with the constraints visible
Public consultationResidents, businesses, councilsFamiliar viewpoints, honest scale, clear before and after
Statutory and permitting submissionsAuthorities, inspectorsAccuracy, documented method, sometimes verified views
Stakeholder coordinationUtilities, landowners, agenciesSpecific locations, clear overlays
Design reviewThe design teamTechnical clarity more than beauty
Marketing and funding bidsFunders, politiciansPolished, but must remain defensible

A model that serves one purpose may need rework for another. I always asked for a one-paragraph visualization brief before starting: who is this for, what decision will it inform, where will it be shown, and what must it not claim.


The InfraWorks Pipeline for Visualization

1. A model built on honest data

Visual quality is inherited from the model. Start with the points in InfraWorks: Planning and Conceptual Design with GIS Data: authoritative terrain and imagery, properly set coordinate system and units, clean vector layers with the attributes that drive appearance (road class and lanes, building height and use, land use category), and a data register. The visualization will make every data error visible. A building footprint with a wrong height becomes a tower in the middle of a village. A terrain with a 10-meter cell size becomes a faceted hill. Check the model as a visitor would, by walking through it, before you design anything.

2. Existing conditions, then proposals

InfraWorks keeps the existing situation and the proposals separate. That is the single most useful structure for visual communication:

  • The existing model is the baseline: what is there today.
  • A proposal is a version of the future: roads, bridges, buildings, drainage, landscaping, grading.
  • You can have several proposals (option A, B, C), switch among them and show them from the same camera positions.

The discipline is to make every proposal differ only by what it proposes, so that the comparison is fair.

3. Building the proposal at the level of detail the audience needs

InfraWorks lets you sketch roads, bridges, drainage and other elements quickly, and place buildings, trees, city furniture, coverage areas and imported 3D models. A few principles:

  • Model what matters to the view. If a viewpoint looks at a junction, model the junction properly: lanes, kerbs, markings, signs, lighting, crossings. If the road is a distant line, leave it simple.
  • Use real standards: lane widths, kerb heights and street furniture that match the design standard. People notice when a crossing is wrong.
  • Show the loss as well as the gain: removed trees, demolished buildings, noise barriers, retaining walls, cuttings and embankments. Hiding impacts is the quickest way to lose trust.
  • Import accurate models for key elements, such as a bridge or a building designed in other software. See Civil 3D for GIS Users: Beginner’s Guide for the engineering side, and BIM and GIS Integration: Revit, IFC and CityGML for building models.

4. Styling for clarity

The visual style of the model includes terrain and imagery draping, road and surface materials, building colors and textures, water, sky, and lighting. For a consultation:

  • Choose a consistent style for the whole model, and keep it for all alternatives.
  • Use neutral colors for context and a consistent distinguishing color for the proposal, if you want it to stand out (in design review), or realistic materials (in a consultation about appearance). Decide which, and say so.
  • Keep imagery current. An orthophoto showing a building that has since been demolished undermines the entire model.
  • Handle vegetation with care (see below).
  • Time of day and weather: pick a neutral, clear, mid-day light, unless the question is about shadows or evening conditions. Don’t use golden-hour light on one option and flat midday light on another.

5. Cameras and viewpoints

The camera is where honesty is won or lost. See the section below.

6. Storyboards and animation

InfraWorks storyboards let you assemble camera views, proposals and settings into a sequence, with transitions and animated camera paths, and export them as video or images. A storyboard is a script: it decides what the viewer sees, in what order and for how long.

7. Output and sharing

Export still images, videos and, depending on the version and subscription, interactive views or shared models through Autodesk’s cloud services, and options for virtual or augmented reality. Check what your version and subscription offer. Always keep the model file, the proposal definitions and the storyboard settings archived with the outputs, so that images can be reproduced and defended later.


Honest Visualization: The Rules I Wrote After the Forester

1. Choose viewpoints that people actually have

The most important views are those from where people will be: their homes, their gardens, the school gate, the pavement outside the shop, the bus stop. Ask the community, and include their suggestions. Choose also the worst-case views, such as the closest property and the most open sightline, and show them. A set of views that includes only the flattering ones will be recognized as such.

2. Use a human eye height

A person standing is about 1.6 meters above the ground, and a person in a car a little higher. Aerial views (for orientation) are fine, but label them as such, and don’t rely on them to show how a scheme feels. Many of the best views are from ground level, at eye height, looking along a street.

3. Use a natural lens

The field of view controls how much of the scene fits in the picture, and how large distant objects look. Wide-angle views make distances feel longer and objects smaller, so a proposal looks less imposing. Telephoto views compress distance and make objects look larger and closer. A lens equivalent to about 35 to 50 millimeters in the 35-millimeter photographic convention approximates how people perceive a scene:

Lens (35 mm equivalent)Horizontal field of viewCharacter
24 mm74 degreesWide: exaggerates distance, makes things look smaller
28 mm66 degreesWide
35 mm54 degreesNatural for wide scenes
50 mm40 degreesNatural, close to normal vision
85 mm24 degreesNarrow: compresses distance, makes things look larger

You can calculate a field of view yourself: the horizontal angle is 2 x arctan(sensor width / (2 x focal length)), with a 36-millimeter sensor width for the 35-millimeter convention.

import math

def horizontal_fov(focal_mm, sensor_width_mm=36.0):
    return math.degrees(2 * math.atan(sensor_width_mm / (2 * focal_mm)))

for f in (24, 28, 35, 50, 85):
    print(f, round(horizontal_fov(f), 1))
# 24: 73.7, 28: 65.5, 35: 54.4, 50: 39.6, 85: 23.9 degrees

Use the same lens for all options at the same viewpoint, and state it. If you need to show a wide area, use a panorama and say so, rather than a fish-eye lens that distorts.

4. Same camera, every option

For each viewpoint, produce the existing view and every proposal from exactly the same camera position and settings. In InfraWorks, a saved camera position makes this straightforward. A before-and-after pair or a slider is the most powerful communication tool of all, and it works only if the camera does not move.

5. Vegetation: tell the truth about time

My forester’s lesson. Plant new vegetation at the size it will have at opening, and, if you want to show maturity, show a separate view labeled with the number of years (for example, “After 15 years”). Don’t plant ten-meter trees on day one. Show existing vegetation that will be removed as removed. Show seasons honestly: leaf-off views in winter are the worst case for screening.

6. Light and weather

Use consistent, neutral conditions for comparison. If shadows or lighting matter (a tall structure near houses), do a dedicated study with the dates and times stated.

7. Scale cues

People judge size from familiar objects: cars, people, street lights, bus stops, door heights. Include them at correct size. A proposal without scale cues is much easier to misjudge.

8. Be clear about what is certain and what is not

A model that looks finished suggests a design that is finished. If the proposal is a concept, label it so, in the image, not just in the report. Distinguish between fixed elements and indicative ones (landscaping, materials, finishes). Include the date and version on every image.

9. Show alternatives equally

Give every option the same effort, the same quality and the same number of views. People can feel when an alternative has been shown in a poorer light, literally.

10. Provide the method

For anything submitted formally, document how the views were produced: the data, the software, the camera settings, the date. In some countries, professional guidance exists on visual representation of development proposals, including verified views (photomontages that follow a defined method and can be checked). Check the guidance that applies in your jurisdiction. When a regulator or a court may examine the visuals, follow it.

11. Don’t use the picture to argue

The visualization is there to inform. A commentary can argue. The image must not.

12. Accessibility

Provide descriptions and captions for images and videos, readable text sizes, sufficient contrast, and formats that open on ordinary devices. Offer a printed version of key views for people who aren’t online. See Story Maps and Interactive Dashboards.


Camera Paths and Fly-Throughs: The Practical Numbers

A fly-through is seductive, and a badly paced one makes people feel sick or suspicious. Some practical figures.

Speed

  • Travel along a route at the speed people really travel. A car at 30 or 50 kilometers per hour, a cyclist at 15 to 20, a pedestrian at about 5. A fly-through of a road at 120 kilometers per hour is a roller coaster.
  • Slow down at junctions, crossings and anything you want people to understand.
  • Avoid sudden changes in direction and height. Smooth the camera path.

Duration and frames

def flythrough(path_km, speed_kmh, fps=30):
    seconds = path_km / speed_kmh * 3600
    return seconds, int(round(seconds * fps))

print(flythrough(3.0, 30))     # (360.0, 10800): 6 minutes, 10,800 frames at 30 fps
print(flythrough(3.0, 60))     # (180.0, 5400)
print(flythrough(0.8, 15))     # (192.0, 5760): a cycle route of 800 m at 15 km/h

Six minutes is long for a meeting. Consider segments of one to two minutes for different parts of the route, or a faster but still believable pace with clear markers (“Junction with the High Street”). Long videos also take a long time to render, so plan your production days.

File size

A video’s size depends on its bitrate. At 8 megabits per second, a 6-minute video is about 360 seconds x 8 / 8 = 360 megabytes. At 4 megabits per second, half of that. For email or a council website, plan for compressed versions. Keep a master at high quality.

Frame rate and resolution

1920 by 1080 pixels at 25 or 30 frames per second is a sensible standard for presentation. Higher resolutions are useful for large screens, and cost render time and file size.

Audience comfort

  • Keep the horizon level.
  • Don’t spin or tilt the camera for effect.
  • Pause on key views for several seconds.
  • Add captions or labels for places and options.
  • If you add narration, keep it factual and in the language of the audience. Provide subtitles.

Running a Consultation With the Model

The best visualization fails if the session is badly run.

Preparation

  • Know your viewpoints, and have a backup for each.
  • Test the technology on the actual equipment in the venue. Screens, projectors and sound behave differently.
  • Prepare printed boards with the key before-and-after views, at a readable size. Many people prefer paper.
  • Prepare a map that shows where each view was taken, with arrows for the direction. See Mapping and Plotting in AutoCAD Map 3D: Styles, Thematic Maps and Map Book.
  • Brief the presenters: what the model shows, what it doesn’t, and what is still undecided.

During the session

  • Let people ask for views (“Can you show me from my garden?”). A live model is more credible than a fixed film, and a request that cannot be answered should be recorded and answered afterward, honestly.
  • Show the existing view first, then each option, from the same position.
  • Keep to the neutral settings unless asked.
  • State the limits out loud: concept, indicative, subject to design.
  • Record comments and requests, with their locations. Map-based comment tools help. See Story Maps and Interactive Dashboards.
  • Don’t oversell. Let the model speak.

Afterward

  • Publish the material (images, videos and boards) with the dates and versions, and keep them available.
  • Respond to the views requested that weren’t shown.
  • Update the model and proposals after the consultation, and keep a version history of what was shown to whom. This matters if a decision is later questioned.

When InfraWorks Isn’t Enough

InfraWorks is quick and integrated, and not the most photorealistic tool. Sometimes you need more.

  • Photorealistic rendering: real-time renderers and game engines can produce much higher visual quality, with realistic materials, vegetation and lighting, from exported models. They need more skill, more time and more care that the data stays faithful. Check how coordinates, units and scales survive the export.
  • Photomontage: inserting the 3D proposal into a photograph of the real site, taken from a known position, is the standard for some statutory submissions. It requires accurate camera matching and surveyed reference points.
  • GIS 3D scenes: for large-area visualization with analytical overlays, GIS tools offer 3D scenes. See Digital Twins and 3D GIS.
  • Design-grade models: for detailed design review, use Civil 3D and BIM tools. See Surfaces and TIN Models in Civil 3D: Slope, Volumes and Watersheds.
  • Interactive web viewers: for public access to 3D models online, use web-based viewers, which need streaming-friendly data. See Autodesk Platform Services (APS): Web Viewers and APIs for CAD and GIS Data and Cloud-Native Geospatial (COG, STAC, Zarr).

The best practice, as with everything in this series, is to use each tool for what it does well, keep the data in open or well-documented forms, and check that the visual output is still true to the model.


Quality Control for Visual Products

I treated every visualization package as I treated a drawing set: it needed a check before release.

The checklist

  1. Brief: purpose, audience and claims written down.
  2. Data: sources, dates and licenses recorded. Imagery current and licensed for the use.
  3. Model: coordinates and units verified. Existing conditions checked against reality at several places. Heights plausible.
  4. Proposals: correct and complete. Impacts shown. Alternatives treated equally.
  5. Cameras: the same lens, height and position for all options. Eye heights realistic. Worst-case views included.
  6. Vegetation: plausible size, stated maturity.
  7. Scale cues: present and correct.
  8. Labels and captions: date, version, status (concept, indicative) and viewpoint location.
  9. Technical quality: no floating objects, intersecting geometry, texture glitches, missing terrain tiles or flickering.
  10. Output: resolution, frame rate and file size suitable. Accessible versions made.
  11. Independent review: someone who did not make it looks, and especially someone who knows the site.
  12. Archive: model, proposals, camera settings, storyboard and outputs, with the version.

The reviewer who knows the site

The most valuable reviewer I ever had was a site foreman, who spent five minutes on a model and said, “That wall is on the wrong side of the stream.” He was right. Ask someone who knows the place.


A Worked Example: A Riverside Flood Wall and Promenade

Task: prepare visual material for a public consultation on a flood protection scheme: a 700-meter wall and raised promenade along a riverside, with three alternatives for the height and finish.

  1. Brief: audience is residents and shopkeepers whose properties face the river, and the council. Purpose: understand how the wall would look and feel, and compare three options (a 1.1-meter masonry wall, a 0.6-meter wall with demountable barriers, and a raised, planted bank). Must not claim flood levels beyond the hydraulic report.
  2. Data and model: a LiDAR terrain at 1 meter, a current orthophoto, building footprints with surveyed heights, the existing trees from a tree survey, street furniture from a mobile survey. Check against survey control, and walk the model: one building is 3 meters too tall (a data error), and two street lights are missing. Fix them.
  3. Existing view: an eye-height view from the promenade, and views from the first-floor windows of the three closest buildings, with permission, plus a view from the bridge. Camera positions are saved.
  4. Proposals: three proposals, each with the wall, steps, planting and lighting at design standards. Trees removed are shown as removed. New planting is shown at planting size, with a separate “after 10 years” view for the planted bank only.
  5. Lens and light: 35-millimeter equivalent for all street views, a 28-millimeter equivalent only for the narrow riverside path, stated in the caption. A neutral mid-day light. A separate winter, leaf-off view of the worst-case window.
  6. Scale cues: people and a standard bench at correct size, a car on the road, and a door in the nearest building.
  7. Storyboards: one per option, with the same sequence: existing, proposal, a pause at each key view, and a 90-second walk along the promenade at walking pace (700 meters at 5 kilometers per hour is about 8 minutes, so the video shows the three key segments only, with markers).
  8. QC: a colleague who lives near the river reviews, and notices that the planted bank option hides a view of the bridge from the café, which is true and should be shown. Add that view. The foreman equivalent points out a missing flood gate at the lane. Add it.
  9. Outputs: printed A1 boards with before and after pairs for each option, a map showing viewpoints, three short videos (1 minute 30 each, with subtitles), and a web page with the images and descriptions. A statement on every image: “Indicative concept, subject to detailed design. Date and version.”
  10. Consultation session: the model runs live on a laptop, and four residents ask for new views, which are saved and answered. Eighty comments are recorded on the map.
  11. After: the new views and the council’s responses are published. The preferred option is refined, and a verified photomontage set is prepared for the formal submission, following the applicable guidance.
  12. Archive: the model, proposals, cameras, storyboards, outputs and the consultation record, with versions.

Nobody said the pictures were pretty. People said they were fair, which was the compliment I had been working toward for years.


Common Mistakes

  • Flattering viewpoints only.
  • Mature trees on opening day.
  • Different lenses, light or cameras for different options.
  • A wide-angle lens that makes the proposal look smaller.
  • No scale cues, or cues at the wrong size.
  • A concept that looks finished, with no label.
  • Outdated imagery that contradicts reality.
  • Wrong building heights and missing objects, from unchecked data.
  • Fly-throughs at impossible speeds.
  • Giant videos that nobody can open.
  • Not archiving the proposals and camera settings, so that nobody can reproduce what was shown.
  • Hiding impacts such as removed trees and new walls.
  • Not involving someone who knows the site.
  • Presenting the visuals as an argument.
  • Forgetting accessibility for people who cannot see, hear or read the material.

Best Practices

  • Write the brief first: purpose, audience and limits.
  • Start from checked data, and walk the existing model before designing.
  • Keep existing and proposed separate, and treat all alternatives equally.
  • Save cameras, and reuse them for every option.
  • Use human eye height and natural lenses.
  • Show impacts and worst cases.
  • Be honest about vegetation, light and maturity.
  • Label status, date and version on every image.
  • Pace animations at real speeds, with pauses.
  • Provide accessible formats, printed and digital.
  • Run an independent review, including a site expert.
  • Archive everything that is needed to reproduce what was shown.
  • Follow professional guidance on verified views where it applies.

Final Thoughts

I have seen visualizations win projects and I have seen them sink them, and the difference was almost never the quality of the rendering. It was trust. A modest, fair, clearly labeled image that shows the closest house, the felled trees and the new wall tells the audience that the people behind the scheme have nothing to hide. A dazzling image that shows only the best light tells them the opposite.

If you are starting out with InfraWorks, spend your first effort not on the realism of the materials, but on the discipline of the setup: honest data, saved cameras, equal treatment of options, truthful vegetation and clear labels. Then add polish. And before the first public showing, ask one person who knows the place to look at it for ten minutes. If they find nothing to object to, you are ready. If they find the wall on the wrong side of the stream, you will be very glad you asked.

Where to go next: go back to the modeling foundations in InfraWorks: Planning and Conceptual Design with GIS Data, and see how to build web viewers for CAD and 3D data in Autodesk Platform Services (APS): Web Viewers and APIs for CAD and GIS Data.

Rachid Khouri

Rachid Khouri

Rachid Khouri is a CAD, BIM and GIS professional, Autodesk Authorized Developer, trainer and technical author with more than 30 years of experience, working with AutoCAD since 1992. He founded GISauthority.com to share practical guidance on GIS and spatial technologies.